Khazar Oil Company awarded the technical inspection and overhaul planning for the Iran Amir Kabir semi-submersible platform to Energy Gostar Sayman. The project aimed to comprehensively assess the platform's structural, mechanical, electrical, instrumentation, and safety systems, and to prepare a detailed overhaul plan. The contract duration was 60 days and progress reached 100%. The scope of work included:
- Structural inspection of platform, deck, legs, and connections
- Inspection of mechanical equipment (drilling systems, cranes, pumps, and compressors)
- Inspection of electrical and instrumentation systems
- Inspection of safety and firefighting systems
- Collection of technical documents and maintenance records
- Technical assessment and identification of deficiencies
- Preparation of overhaul plan including scope, schedule, and resource estimation
- HSE considerations and final documentation